Superintendent Losquadro and Councilwoman Bonner Announce Paving of Sylvan Avenue and Mt. Sinai Avenue
15731
post-template-default,single,single-post,postid-15731,single-format-standard,bridge-core-1.0.5,ajax_fade,page_not_loaded,,qode-title-hidden,qode-child-theme-ver-1.0.0,qode-theme-ver-18.1,qode-theme-bridge,wpb-js-composer js-comp-ver-6.0.2,vc_responsive

Superintendent Losquadro and Councilwoman Bonner Announce Paving of Sylvan Avenue and Mt. Sinai Avenue

Miller Place/Mt. Sinai, NY – Brookhaven Town Highway Superintendent Daniel P. Losquadro and Councilwoman Jane Bonner have announced the completion of the paving of Sylvan Avenue in Miller Place from North Country Road to Route 25A, as well as Alilah Court, and Mt. Sinai Avenue from Canal Road to Route 25 in Mt. Sinai.

Caption: Superintendent Losquadro and Councilwoman Bonner on Mt. Sinai Avenue in Mt. Sinai (left) and Sylvan Avenue in Miller Place.

The total cost for the Miller Place project, which prior to the milling and paving of Sylvan Avenue and Alilah Court, included the repair or replacement of 876 linear feet of curb, 1,025 square feet of sidewalk, 1,142 square feet of handicap ramps and 918 square feet of aprons, as well as drainage maintenance, was approximately $320,000. The total cost for the resurfacing of Mt. Sinai Avenue, which also included drainage maintenance and concrete repairs, was approximately $210,000.

“Both Sylvan Avenue and Mt. Sinai Avenue are heavily-traveled, main arteries that were in need of repair,” Superintendent Losquadro said. “Their resurfacing should provide some much-needed relief for area residents and those who travel the roadways.”

Councilwoman Bonner said, “The recently completed projects have made the roads safer for everyone who uses them, whether they are driving, walking or riding a bicycle. I thank Superintendent Losquadro and the Highway Department for all the work they do to improve our infrastructure as we continue to make road safety a top priority in my Council District.”