DONATE

Logo Logo Logo Logo Logo
Logo

  • Home
  • Meet Dan
    • Endorsements
  • Issues
    • Accomplishments
  • Get Involved
  • Donate
  • Events
  • Media
    • Press Releases
    • Ads
  • Contact Us
  • Home
  • Meet Dan
    • Endorsements
  • Issues
    • Accomplishments
  • Get Involved
  • Donate
  • Events
  • Media

    • Press Releases
    • Ads
  • Contact Us
Our Social
15847
wp-singular,page-template-default,page,page-id-15847,wp-theme-bridge,wp-child-theme-bridge-child,bridge-core-1.0.5,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-18.1,qode-theme-bridge,wpb-js-composer js-comp-ver-6.0.2,vc_responsive

Our Social

danlosquadro

Brookhaven Highway Superintendent

Crews are replacing damaged concrete sidewalk, cur Crews are replacing damaged concrete sidewalk, curbing and aprons on Holbrook Road (pictured here, in front of Sachem Public Library and Nokomis Elementary School). Once this paving preparation work is completed, Holbrook Road will be resurfaced from Portion Road to the LIE Service Road.
On Wednesday, Aug. 26 through Friday, August 28, c On Wednesday, Aug. 26 through Friday, August 28, crews will be milling Randall Road in Shoreham, along with Albert Street, George Street and a portion of Suffolk Down. Weather-permitting, they will return next week to resurface the roadways. Please avoid all unnecessary travel in the area during these times.
Crews have moved into a Manorville neighborhood wh Crews have moved into a Manorville neighborhood where they are repairing damaged concrete aprons and curbing before paving can begin. Once this paving preparation work is completed, the following roadways will be resurfaced: Barbara Anne Street, Bridle Path, Carriage Path, Gateway Lane, Jacqueline Drive, Jerusalem Hollow Road, Manor Hills Drive, Phyllis Court, Saddle Brook Lane, Saddlebrook Court, Sheila Court, Stephanie Lane and Surrey Lane.
On Monday, Aug. 24, and Tuesday, Aug. 25, crews wi On Monday, Aug. 24, and Tuesday, Aug. 25, crews will be milling Wading River Road and the Sunrise Highway South Service Road. Weather-permitting, they will return to resurface the roadways overnight on Thursday, Aug. 27, and Friday, Aug. 28, beginning at 9 pm. Please avoid all unnecessary travel in the area during these times.
Crews are replacing a drain on Eastwood Road in Mi Crews are replacing a drain on Eastwood Road in Miller Place as part of paving preparation for a large, 30-road paving project in the area. Once this upgraded drainage work is completed – along with the inspection and replacement of damaged concrete curbing and aprons – the following roadways will be resurfaced: Ann Street, Audrey Street, Beach Road, Beverly Drive, Daniel Court, Dogwood Hollow Lane, Dogwood Lane, Eastwood Road, Evans Lane, Hayward Avenue, High Hollow Lane, Hill Dale Avenue, Honey Lane, Honey Lane West, Kettle Knoll Path, Knoll Crest, Laurel Hill Road, Magnolia Lane, Maple Lane, Marbeth Circle, Mary Street, Millar Avenue, Old Cow Path, Pardam Knoll Road, Parlar Court, Quiet Court, Sleepy Hollow Lane, Southwood Drive, Valley Circle and Victory Knoll Path.
Crews are replacing a drain on Eastwood Road in Mi Crews are replacing a drain on Eastwood Road in Miller Place as part of paving preparation for a large, 30-road paving project in the area. Once this upgraded drainage work is completed – along with the inspection and replacement of damaged concrete curbing and aprons – the following roadways will be resurfaced: Ann Street, Audrey Street, Beach Road, Beverly Drive, Daniel Court, Dogwood Hollow Lane, Dogwood Lane, Eastwood Road, Evans Lane, Hayward Avenue, High Hollow Lane, Hill Dale Avenue, Honey Lane, Honey Lane West, Kettle Knoll Path, Knoll Crest, Laurel Hill Road, Magnolia Lane, Maple Lane, Marbeth Circle, Mary Street, Millar Avenue, Old Cow Path, Pardam Knoll Road, Parlar Court, Quiet Court, Sleepy Hollow Lane, Southwood Drive, Valley Circle and Victory Knoll Path.
On Wednesday, July 29, and Thursday, July 30, crew On Wednesday, July 29, and Thursday, July 30, crews will be milling seven roadways in a Yaphank paving project. Weather-permitting, they will return on Tuesday, Aug. 4, and Wednesday, Aug. 5, to resurface Charles Street, Donald Avenue, Frank Avenue, Harold Road, Raimond Street, Shannon Blvd., and Valerie Court. Please avoid all unnecessary travel in the area during these times.
Crews are working on Randall Road in Shoreham, whe Crews are working on Randall Road in Shoreham, where they are installing a turning lane and traffic signal in front of the Albert Prodell Middle School. In addition, crews will be inspecting drainage and replacing damaged concrete aprons, sidewalk and curbing along Randall, as well as on Albert Street and George Avenue. Once this paving preparation work is completed, Randall Road, Albert Street and George Avenue will be resurfaced.
Crews are in Center Moriches on Monday, July 27, m Crews are in Center Moriches on Monday, July 27, milling Belleview Avenue, along with St. Johns Place and St. Johns Place Ext. Weather-permitting, they will return to resurface the roadways on Thursday, July 30, and Friday, July 31. Please avoid all unnecessary travel in the area during these times.
Crews have started replacing damaged concrete side Crews have started replacing damaged concrete sidewalk, aprons and curbing on Main Street in Setauket. Once this paving preparation work is completed, Main Street will be resurfaced, along with Dyke Road and Caroline Avenue.
Crews have moved into a Centereach neighborhood wh Crews have moved into a Centereach neighborhood where they are making drainage improvements to alleviate flooding issues. Once this paving preparation work is completed, the following roadways will be resurfaced: Dixie Lane, Rego Avenue, Van Bergen Blvd., Cedar Street, Garden Street, Pine Street, Evelyn Lane, Oak Avenue, Jeremy Court, Park Street, Helen Street, Audrey Lane, Anne Road, Minerva Lane, and Smith Lane.
Crews have moved onto Blue Point Road in Holtsvill Crews have moved onto Blue Point Road in Holtsville where they are replacing damaged concrete sidewalk, curbing and aprons, and inspecting drains. Once this paving preparation work is completed, Blue Point Road will be resurfaced, along with Long Island Avenue from North Ocean Avenue to Waverly Avenue.
On Monday, July 13, crews are milling Fleetwood Dr On Monday, July 13, crews are milling Fleetwood Drive, Mt. White Avenue, and Old Medford Avenue from Horseblock Road to Granny Road in Farmingville. Weather-permitting, they will return on Wednesday, July 15, and Thursday, July 16, to resurface the roadways. Please avoid all unnecessary travel in the area during these times.
On Friday, July 10, and Monday, July 13, crews wil On Friday, July 10, and Monday, July 13, crews will be milling six roadways in Miller Place. Weather-permitting, they will begin resurfacing the roadways – Bobcat Lane, Lightning Lane, Natures Lane, Rocky Mountain Way, Thunder Road, and White Tail Lane – on Monday, July 13, finishing on Tuesday, July 14. Please avoid all unnecessary travel in the area during these times.
Crews are currently milling 17 roadways in a Cente Crews are currently milling 17 roadways in a Centereach paving project. Weather-permitting milling will continue through Monday, July 13, when paving will also commence through July 18. The following roadways will be resurfaced: Arbor Ridge Lane, Arrington Court, Auburn Court, Belwyn Lane, Brookfield Lane, Chevy Drive, Hattie Lane, Marblestone Lane, Millbury Lane, Redwood Lane, Royalston Lane, Tawny Pass, Teaberry Court, Thornridge Lane, Tulip Hill Lane, Tyburn Lane, and Valiant Drive. Please avoid all unnecessary travel in the area through July 18.
Follow on Instagram
Support Dan Losquadro

At the end of the day, Dan's goals are simple: safety and security for our community. There's no substitute for experience.

Quick Links
  • Meet Dan
  • Issues
  • Get Involved
  • Our Social
  • Contact Us
  • Helpful Links
  • Privacy Policy
  • Terms of Use
Our Social

danlosquadro

Brookhaven Highway Superintendent

Crews are replacing damaged concrete sidewalk, cur Crews are replacing damaged concrete sidewalk, curbing and aprons on Holbrook Road (pictured here, in front of Sachem Public Library and Nokomis Elementary School). Once this paving preparation work is completed, Holbrook Road will be resurfaced from Portion Road to the LIE Service Road.
On Wednesday, Aug. 26 through Friday, August 28, c On Wednesday, Aug. 26 through Friday, August 28, crews will be milling Randall Road in Shoreham, along with Albert Street, George Street and a portion of Suffolk Down. Weather-permitting, they will return next week to resurface the roadways. Please avoid all unnecessary travel in the area during these times.
Crews have moved into a Manorville neighborhood wh Crews have moved into a Manorville neighborhood where they are repairing damaged concrete aprons and curbing before paving can begin. Once this paving preparation work is completed, the following roadways will be resurfaced: Barbara Anne Street, Bridle Path, Carriage Path, Gateway Lane, Jacqueline Drive, Jerusalem Hollow Road, Manor Hills Drive, Phyllis Court, Saddle Brook Lane, Saddlebrook Court, Sheila Court, Stephanie Lane and Surrey Lane.
On Monday, Aug. 24, and Tuesday, Aug. 25, crews wi On Monday, Aug. 24, and Tuesday, Aug. 25, crews will be milling Wading River Road and the Sunrise Highway South Service Road. Weather-permitting, they will return to resurface the roadways overnight on Thursday, Aug. 27, and Friday, Aug. 28, beginning at 9 pm. Please avoid all unnecessary travel in the area during these times.
Crews are replacing a drain on Eastwood Road in Mi Crews are replacing a drain on Eastwood Road in Miller Place as part of paving preparation for a large, 30-road paving project in the area. Once this upgraded drainage work is completed – along with the inspection and replacement of damaged concrete curbing and aprons – the following roadways will be resurfaced: Ann Street, Audrey Street, Beach Road, Beverly Drive, Daniel Court, Dogwood Hollow Lane, Dogwood Lane, Eastwood Road, Evans Lane, Hayward Avenue, High Hollow Lane, Hill Dale Avenue, Honey Lane, Honey Lane West, Kettle Knoll Path, Knoll Crest, Laurel Hill Road, Magnolia Lane, Maple Lane, Marbeth Circle, Mary Street, Millar Avenue, Old Cow Path, Pardam Knoll Road, Parlar Court, Quiet Court, Sleepy Hollow Lane, Southwood Drive, Valley Circle and Victory Knoll Path.
Crews are replacing a drain on Eastwood Road in Mi Crews are replacing a drain on Eastwood Road in Miller Place as part of paving preparation for a large, 30-road paving project in the area. Once this upgraded drainage work is completed – along with the inspection and replacement of damaged concrete curbing and aprons – the following roadways will be resurfaced: Ann Street, Audrey Street, Beach Road, Beverly Drive, Daniel Court, Dogwood Hollow Lane, Dogwood Lane, Eastwood Road, Evans Lane, Hayward Avenue, High Hollow Lane, Hill Dale Avenue, Honey Lane, Honey Lane West, Kettle Knoll Path, Knoll Crest, Laurel Hill Road, Magnolia Lane, Maple Lane, Marbeth Circle, Mary Street, Millar Avenue, Old Cow Path, Pardam Knoll Road, Parlar Court, Quiet Court, Sleepy Hollow Lane, Southwood Drive, Valley Circle and Victory Knoll Path.
On Wednesday, July 29, and Thursday, July 30, crew On Wednesday, July 29, and Thursday, July 30, crews will be milling seven roadways in a Yaphank paving project. Weather-permitting, they will return on Tuesday, Aug. 4, and Wednesday, Aug. 5, to resurface Charles Street, Donald Avenue, Frank Avenue, Harold Road, Raimond Street, Shannon Blvd., and Valerie Court. Please avoid all unnecessary travel in the area during these times.
Crews are working on Randall Road in Shoreham, whe Crews are working on Randall Road in Shoreham, where they are installing a turning lane and traffic signal in front of the Albert Prodell Middle School. In addition, crews will be inspecting drainage and replacing damaged concrete aprons, sidewalk and curbing along Randall, as well as on Albert Street and George Avenue. Once this paving preparation work is completed, Randall Road, Albert Street and George Avenue will be resurfaced.
Crews are in Center Moriches on Monday, July 27, m Crews are in Center Moriches on Monday, July 27, milling Belleview Avenue, along with St. Johns Place and St. Johns Place Ext. Weather-permitting, they will return to resurface the roadways on Thursday, July 30, and Friday, July 31. Please avoid all unnecessary travel in the area during these times.
Follow on Instagram

Paid for by Friends of Dan Losquadro . A copy of our financial disclosure report is available to view via the New York State Board of Elections (NYSBOE).